新闻资讯

新闻资讯

current position: Home > News Center > Technical Information

contact usContact Us

Dongguan KIWACN Information Technology Co., Ltd

东莞凯王信息科技有限公司

电话:+86-0769- 81730255 81730256

传真:+86-0769- 81730700

电子邮件:whp@kiwaworld.com

地址:广东省东莞市塘厦镇科苑城鹿苑路168号B栋

 

华北办事处

联系方式:+86-0769- 81730255

传真:+86-0769- 81730700

手机:13911818490

电子邮件:whj@kiwaworld.com

地址:北京市海淀区知春路132号617


How to install the industrial control chassis correctly?

2022-10-11 08:46:15
times

As an important equipment in the field of industrial control, the installation process of the industrial control chassis is very critical. Correct installation can ensure the normal operation of the chassis, extend its service life and improve work efficiency. The following are detailed steps on how to correctly install the industrial control chassis:

Choose a suitable installation location: First, you need to choose a dry and ventilated location to install the industrial control chassis, avoiding direct sunlight and humid environments. At the same time, ensure that the location is convenient for maintenance and cleaning.

Prepare installation tools: Some tools are required to install the industrial control chassis, such as screwdrivers, wrenches, etc. Before installation, make sure all installation tools are complete.

Open the chassis: Open the outer shell of the industrial control chassis, usually use a screwdriver to unscrew the screws on the outer shell, and then remove the outer shell.

Industrial control service chassis, industrial control chassis, server chassis manufacturer

Install hardware devices: Install the required hardware devices, such as motherboard, CPU, memory stick, etc., into the chassis according to the steps in the manual.

Connect the power cord: Connect the power cord to the power interface of the chassis and plug the other end into the power socket. Make sure that the power cord is connected correctly to avoid accidents such as electric shock.

Adapt hard disk: When installing the hard disk, you need to adjust it according to the hard disk position in the chassis and fix the hard disk with screws.

Wiring: Connect the wiring harnesses between the components to the corresponding interfaces on the motherboard, such as USB interfaces, audio interfaces, etc.

Close the chassis: After installing all the hardware devices, cover the chassis shell and fix the shell with screws.

Connect the monitor and peripherals: Connect the monitor and other peripherals to the host and ensure that the connections are correct.

Power-on test: Finally, connect the power supply, turn on the industrial control chassis, and check whether all components are working properly.

Through the above steps, we can correctly install the industrial control chassis to ensure its normal operation. At the same time, in daily use and maintenance, pay attention to regular cleaning of the chassis to avoid dust accumulation affecting the heat dissipation effect and extend the service life of the chassis.


Recently Viewed:

Related news

  • menu
Contact

+86-0769-81730700  +86-81730255 

+86-0769- 81730256

Email: whj@kiwaworld.com

Address: Building B, No. 168, Luyuan Road, Keyuancheng, Tangxia Town, Dongguan City, Guangdong Province

Technical Support: huaqilifang disclaimer